The following pictures show some of the work we've been doing around our house this spring. All photos were taken in May - August 2001. If you'd like to see some more photos, this page has some photos from April 2001, this page has some photos from May 2000, this page has some photos from January 2000, this page has some photos from December 1999, and this page has some older shots from May 1999 before we moved in. Most photographs on this page are Copyright © 2001, Chris Swingley. All photos with me in them are Copyright © 2001, Andrea Swingley.

Each of the photographs are between 5 - 10 K, so the page will load slowly over a modem link.

Index of pages About Me:

Cabin Renovation (summer 2010) New Shed (fall 2008) New Dog Yard (fall 2007)
Moving (fall 2008) Dog Yard Tree (summer 2005) Living Room (winter 2004) New Water Tank (summer 2004)
Siding (Aug 2001) Windows (Apr 2001) Water tank (May 2000) January 2000
December 1999 May 1999 Darwin Alexi
Ivan Moose 2002

Installing Siding

Trim and Siding Now that the windows are in, it's time to put siding on the house to cover the painted plywood exterior that we've currently got. When we bought the house, we almost lost our loan because the bank wanted us to put T-111 over the existing plywood "siding." Luckily they relented, and we were able to spend our money on good siding instead of T-111 plywood.

Building paper and lathe We ordered 8 inch bevel siding, and 4 inch trim boards made of local (Cache Creek) White Spruce from Alaskan Birchworks. Bob Zachel is a good guy to deal with, and he gives you a good, locally produced product. You can see the stuff drying in the photo.

Brushing off sawdust (may 22) I decided to install the siding to last, using 15 pound tar paper over the sheathing and an air space behind the siding created with lathe so that any moisture that gets behind the siding can escape without wicking into the siding or the walls. We'll be finishing the siding in a dip tank, so all six sides will be protected before installation.

Dipping the trim (june 11) The siding air dried in our driveway for four weeks, and is dry enough to stain and install on the house. The first step in the dipping process is to brush all the sawdust off the wood. It's probably not necessary, but at $20.00 / gallon I don't want to be paying to stain sawdust.

Trim against the house Here I'm dipping a piece of trim into the tank. True to it's name, the White spruce wood is really bright white before dipping. We chose Superdeck Exterior Transparent Stain in "Natural". It's a lot yellower than I had expected (as you can see from the trim boards on the drip rack), but as it ages it will darken and lose some of the yellowish tinge.

While the board is sitting in the stain, each board on the drip rack needs to be flipped over and moved up the rack. Flipping the board allows me to wipe off the excess stain (from when that corner was oriented downward), and it helps to redistribute any remaining excess so I don't wind up with a tacky section.

Nailing siding When the drip rack is filled, the top board is fairly dry, so it can be moved to the side of the house to dry the rest of the way. I nailed the edge of a large tarp to the underside of the roof and made a big tent over the drying siding. After 24 hours, I can re-stack the trim and siding in anticipation of hanging it. It took about two weekends of solid work to stain all of the siding and trim for the house.

(july 2) The north side of the house is finished (except for the garage, and am about a third of the way up the west side. The north side is visible from the road, and the west side of the house is the side that visitors approach from. At this point I've gotten above my head, so a temporary scaffold is necessary to continue. I should be able to get to the bottoms of the upper windows with this scaffold, at which point I'll have to build a taller one.

Leveling (july 8) A shot near the limit of my range for the lower scaffold. This lower scaffold is two extra pieces of spruce left over from cutting the siding, bolted together and resting on three ladders.

My second scaffold The siding is 8 inches wide, but I'm overlapping it by 2 inches to allow for expansion and contraction with the weather. Butt joints are cut at an angle so that any expansion and contraction in the long dimension won't open up a black gap to the tar paper beneath.

Close up of west side

Even though I'm carefully marking the reveal on each course, the siding isn't perfectly square or straight, so I also level each course with a level. The photo on the right shows me making small adjustments with the board wedged between the trim pieces -- a good technique when you are alone on the scaffold and need a couple extra hands!

West side from the driveway

(july 9) Making progress. . . I've now reached the second floor windows on the west side of the house and have raised the scaffold in order to continue working. I bolted the two spruce planks together at the middle, and ran a lag bolt through both planks, into the support member that sits on the deck. The ends of the planks rest in the top rungs of the ladders. Blocking keeps the ladders from moving, and prevents the planks from moving toward or away from the house.

South side nailing (aug 8) Here I'm up on my new, improved scaffold working on the south side of the house. The scaffold is a spruce off-cut that is suspended from the roof trusses by a set of eye bolts and thick chain. Each side is tied to bolts driven into the side of the house so that the platform won't move from side to side or in and out. I also have a bumper which prevents the scaffold from swinging into the house. It's very secure, but a little shaky so good balance is important.

South west corner Getting close to finishing the south side. I've got a few more courses next to the guest bedroom window, and then the small triangular section near the wood stove chimney and I'll have all but the east side of the house and the garage done!